Forms and Downloads

SSI-Logan

Sampling and Analysis Requirements:

Test Sampling Frequency
TPH (8015) One 5 point composite sample for every 100 cubic yards or 150 tons shipped
VOC (8260) One grab sample for every 800 cubic yards or 1,200 tons shipped
Total Metals (6010) Arsenic, Antimony, Barium, Beryllium, Cadmium, Copper, Lead, Nickel, Thallium, Zinc (6010): One composite sample for every 800 cubic yards or 1,200 tons shipped
TCLP Metals (1311/6010) One composite sample per Site
Paint Filter (9095) One composite sample per Site

If the site's prior use is considered "Industrial" or "Historic Fill", please provide the following:

Test Sampling Frequency
PCB's (8082) One composite sample for every 800 cubic yards or 1,200 tons shipped
PAH's (8270) One composite sample for every 800 cubic yards or 1,200 tons shipped
Pesticides (8081): One composite sample for every 800 cubic yards or 1,200 tons shipped

Project volumes are estimates and many times volume increases will require additional testing to meet Soil Safe's Permit frequency requirements. Additional testing is the responsibility of each client. Arrangements can be made with Soil Safe to aid in additional testing. Please contact your Sales Representative to discuss any additional testing needs.